Cooling and power failures
Cooling and power failures undo the habit of starting with a software failover. Machines stop because they are too hot, or because unstable voltage has forced cooling into lockout.
Proton lost Frankfurt cooling on August 27, 2026 after filters were replaced on both redundant compressors at night, without notice. Servers and network gear shut down as temperatures rose about three to four times faster than the historical norm, which the case ties to denser hardware. Database failover still needed a person to avoid a split brain, and it assumed a total site loss rather than machines dying one by one. Network cards stayed locked until staff with out-of-band credentials cold-reset them.
On August 19, 2026 a storm disabled Nebius us-central1 cooling and the building management system together. Inlet temperature hit 58.5°C in about two hours. Servers, switches, and rack power shut down, with no facility alert outside the system that had failed. Virtual-machine recovery did not cover a region-wide restart, and a managed-disk hot-plug bug left secondary disks detached. Hundreds of Managed Kubernetes control planes stayed down until a mass restart.
Azure West US 2 began as a thunderstorm with voltage instability. Cooling lockouts stopped compute, network, and storage in two physical zones, and storage validation plus a telemetry backlog outlasted cooling. Coinbase's May 7, 2026 trading halt aligns with an AWS thermal/facility event: matching-engine quorum was lost, and Kafka-related dependencies still blocked recovery.
Cases in this pattern
Cloud Infrastructure
Microsoft Azure West US 2 power and cooling PIR
A severe thunderstorm caused power disturbances across multiple datacenters in West US 2, triggering cooling lockouts and protective shutdowns across two physical availability zones. The hard part of the investigation was proving why recovery remained slow after cooling returned: storage validation and telemetry backlog had become the new bottlenecks.Cloud Infrastructure
Coinbase May 7, 2026 outage postmortem
A severe service outage interrupted trading and most customer-facing functions. The investigation had to trace a facility event through quorum loss, Kafka leader-election problems, and staged recovery blockers rather than stopping at the first platform symptom.Cloud Infrastructure
Nebius us-central1 Disruption: Storm-Induced Cooling Failure and Managed Disks Hot-Plug Recovery Bug
A storm-related event at a data center facility disabled the building management system and chilled-water cooling loop, causing data halls to overheat to a peak inlet temperature of 58.5°C within roughly two hours. Servers, network switches, and rack power systems shut down on thermal protection, triggering a region-wide outage across GPU/CPU compute, storage, Managed Kubernetes, Token Factory, and regional API/console endpoints. Recovery took significantly longer than facility cooling restoration because a region-scale cold start required manual intervention in multiple recovery paths, and a bug in the managed disks hot-plug functionality left secondary data disks unattached after instance recovery, keeping hundreds of Managed Kubernetes control planes down until a controlled mass restart was applied.Cloud Infrastructure
Frankfurt Datacenter Cooling Failure Triggers Multi-Hour Proton Service Outage
On August 27, 2026, Proton experienced a widespread multi-hour outage after a total cooling system failure in its Frankfurt datacenter caused server and network equipment to overheat and shut down. The outage was prolonged because primary database failover required human decision-making to avoid split-brain scenarios, and the on-call team initially prioritized saving hardware over restoring services due to the extreme rate of temperature rise. Recovery was further delayed when network cards entered thermal-protection lockout requiring cold system resets that demanded additional staff with out-of-band access credentials.Cloud Infrastructure
Google Cloud europe-west2 London Outage: PLC Misconfiguration Blocked Generator Start After Cable Fault
On October 19, 2026 at 22:53 US/Pacific (October 20, 06:53 BST), an external underground cable fault cut primary utility feed A to the data center facility hosting Google Cloud zone europe-west2-b in London. The site was in a temporary single-feed (1N) posture because feed B's breaker had been opened on October 14 after a quarterly generator load test found issues, so feed A carried the entire critical load alone. The backup generators never started: the programmable logic controller (PLC) undervoltage sensing was wired upstream (line side) of the isolated feed B breaker, so both master PLCs sensed live voltage on a disconnected path and concluded a healthy utility source was available. The UPS batteries, providing about five minutes of runtime, carried the load until depleted, and the zone lost power entirely. Primary impact lasted 6 hours and 8 minutes; zone-scoped resources in europe-west2-b were unreachable, and the broader europe-west2 region saw transient latency and elevated errors as workloads failed over into adjacent zones.